GMS prepared concrete repair details for the existing 55-foot-long cellar-level tunnel between buildings P and B, as well as for associated stairs and entrances and the adjacent driveway at this NYC HHC Facility. GMS also provided waterproofing repair details along the entire length of the tunnel.
Owner: NYC HHC
Client: Arcos Group Incorporated