GMS provided full structural engineering design and construction administration services for this 9-story, 100,000 sf building and for the master plan to upgrade services provided to the community. The $74 million project included connections to three existing buildings, a transfer truss supporting four levels over an existing building, and a two level pedestrian bridge connecting to an existing parking garage. It was fully occupied in the spring of 2009.
Architect: Perkins Eastman Architects, PC