GMS conducted a comprehensive condition assessment of the exterior walls at this 8-story concrete frame structure with a brick masonry façade. The building was constructed in 1978, and the masonry is currently exhibiting distress and deterioration in the forms of cracking, bulging and displaced bricks.
Client: St. Joseph’s Hospital