GMS envelope group was retained by the engineer of record to develop a scheme for installing new masonry over the existing building façade of the 20-story occupied building after it was discovered that the original construction was unsuitable for conventional re-cladding. The work included the design of a steel tube sub-frame to support the brick and limestone façade.
Client: Braxton Engineering